Rail Projects
Below, you can read about a small selection of projects planned with ProVI. These include everything from light and suburban railway design to the design of high-speed lines.
Below, you can read about a small selection of projects planned with ProVI. These include everything from light and suburban railway design to the design of high-speed lines.
New 15 km line for freight traffic
Project duration: 2017–2024
Construction costs: approx. €1.8 billion
Planner: OBERMEYER Planen+Beraten GmbH
Services: basic evaluation, overall planning, preplanning, design planning, approval planning
2.7 km subway line
Project duration: 2016–2020/2026
Construction costs: approx. €450 million
Planner: OBERMEYER Planen+Beraten GmbH
Services: basic evaluation, preparation of award; building and structural planning of civil engineering structures, traffic infrastructure building planning, technical equipment, line route design, supply lines and subsoil
Expansion of existing electrified two-track line to four tracks
Project duration: 2018–2023
Construction costs: approx. €1 billion
Planner: OBERMEYER Planen+Beraten GmbH
Services: overall BIM-based planning, basic evaluation, preplanning, design planning, approval planning and visualization
Improvement of rail link to Munich Airport
Project duration: 2007–2021
Construction costs: approx. €725 million
Planner: OBERMEYER Planen+Beraten GmbH
Services: rail and road traffic infrastructure, tunnels, bridges, underground station, structural planning, signaling equipment, catenary
Project duration: 2002–2020
Construction costs: approx. €900 million
Planner: ILF Beratende Ingenieure ZT GmbH
Services: basic evaluation, preplanning, design planning, planning approval, tender
Project duration: 2013–2020
Construction costs: approx. €473 million
Planner: OBERMEYER Planen+Beraten GmbH
Services: building planning of civil engineering structures and traffic infrastructure, structural planning, technical equipment
1.1 km urban line section with two stops
Project duration: 2013–2019
Construction costs: approx. €19 million
Planner: OBERMEYER Planen+Beraten GmbH
Services: surveying, subsoil, traffic infrastructure building planning, specialist planning of technical equipment across all service/construction phases and traffic routing plans
10 km line section
Project duration: 2016–2018
Construction costs: approx. €40.5 million
Planner: OBERMEYER Planen+Beraten GmbH
Services: planning of earthworks and superstructure works, drainage systems, underground cable works, noise protection walls
Planning of 1st section in slab track on new Wendlingen–Ulm line
Project duration: 2017–2018
Construction costs: approx. €15 million
Planner: OBERMEYER Planen+Beraten GmbH
Services: building planning of traffic infrastructure and
civil engineering: design and approval planning
structural planning: design planning
10 km suburban railway line
Project duration: 2004–2017
Construction costs: approx. €3.5 billion
Planner: OBERMEYER Planen+Beraten GmbH
Services: basic evaluation, preplanning, design planning, approval planning, overall coordination of designers
Section: Wendlingen–Kirchheim, 11 km high-speed line
Project duration: 2003–2016
Construction costs: approx. €640 million
Planner: OBERMEYER Planen+Beraten GmbH
Services: general planning, preplanning, design planning, approval planning
107 km high-speed line
Project duration: 1992–2015
Construction costs: approx. €1.95 billion
Planner: OBERMEYER Planen+Beraten GmbH
Services: preliminary design, route variants, line determination, planning approval process, design, tender, implementation planning, overall coordination, surveying
Extension of tram network in Le Mans
Project duration: 2011–2014
Construction costs: approx. €45 million
Planner: OBERMEYER Planen+Beraten GmbH
Services: basic evaluation, preplanning, design planning, tender, implementation planning
Areas: track construction, 750 V catenary, power
17 km light rail line
Project duration: 2010–2013
Construction costs: approx. €500 million
Planner: OBERMEYER Planen+Beraten GmbH
Services: track construction, depot, vehicles, power supply, catenary, control center, train protection, preplanning, approval planning, tender
Project duration: 1992–2007
Construction costs: approx. €280 million
Planner: OBERMEYER Planen+Beraten GmbH
Services: basic evaluation, preplanning, design planning, planning approval, implementation planning, inventory planning
Section: Mittlern–Althofen
Contract section 60.1, Mittlern; contract section 60.2, Kühnsdorf
Planner: Die Ingenieure ZT GmbH
Services: tender and implementation project and various visualizations
Client: ÖBB Infrastruktur
Planner: Radermacher
Services: slab track system for Taipei airport link; realization of superstructure project on 45 km of viaducts and 11 km of tunnels
Project duration: annual repair work
Planner: Würzburger Straßenbahn GmbH
Services: track network realignment of Würzburg tram for repairs; includes alignment calculation, rail division plan and envelope curve analyses