Road Projects
Below, you can read about a small selection of projects planned with ProVI. These include everything from local access roads and road extensions to the planning of new highways.
Below, you can read about a small selection of projects planned with ProVI. These include everything from local access roads and road extensions to the planning of new highways.
Construction of new test site for BYD technical development team covering approx. 400 ha
Project duration: 2016–2020
Construction cost: approx. €250 million
Planner: OBERMEYER Planen+Beraten GmbH
Services: conceptual study, preplanning, development, implementation planning
Section: 7, Hamburg, construction of A 20 from B 431 to interchange with A 23
Project duration: 2018–2019
Construction costs: approx. €184 million
Planner: OBERMEYER Planen+Beraten GmbH
Services: traffic infrastructure building planning, noise surveys, air pollution study
Eight-lane extension of approx. 15 km section of A 3 between Hilden interchange and Opladen interchange
Project duration: 2016–2019
Construction costs: approx. €84 million
Planner: OBERMEYER Planen+Beraten GmbH
Services: basic evaluation and preplanning of special services: technical equipment (telecommunication systems), noise survey, geotechnical engineering
Project duration: 2016–2018
Construction costs: approx. €86 million
Planner: OBERMEYER Planen+Beraten GmbH
Services: traffic infrastructure building planning, building and structural planning of civil engineering structures
Section: between Westerstede and Elbe Tunnel (Drochtersen), planning of new 12 km section
Project duration: 2009–2017
Construction costs: approx. €108 million
Planner: OBERMEYER Planen+Beraten GmbH
Services: basic evaluation, preplanning, design planning, approval planning and implementation planning, drainage expertise, noise surveys, air pollution studies
Alteration works on Federal Highway Plieningen (interchange)
Project duration: 2008–2016
Construction costs: approx. €35 million
Planner: OBERMEYER Planen+Beraten GmbH
Services: preliminary design, design compliant with the guidelines for the creation of standardized design documents in road construction, planning approval, tender, implementation planning (certain tasks)
Section: Wolfsburg–Lüneburg
Project duration: 2008–2016
Construction costs: approx. €142.5 million
Planner: OBERMEYER Planen+Beraten GmbH
Services: basic evaluation, preplanning, design planning, approval planning, overall coordination
Examination of technical feasibility
Project duration: 2007–2010
Construction costs: approx. €1 billion
Planner: OBERMEYER Planen+Beraten GmbH
Services: roads, traffic engineering, road bridges, tunnels, economic feasibility study and environmental impact study
Project duration: 1986–2008
Construction costs: approx. €125 million
Planner: OBERMEYER Planen+Beraten GmbH
Services: overall planning of approx. 4.5 km main road – including drainage planning
Webling (Graz) interchange: general road overhaul, repair of bridges and extension & Sanierung Lärmschutz
Planer: Die Ingenieure ZT GmbH
Leistung: Bauphasen- und Verkehrsführungsplanung; tender and implementation planning
Client: ASFINAG Bau Management GmbH
Project duration: 2005–2006
Planner: Ingenieurbüro Dieck Braunschweig
Services: variant analysis, overall planning of roundabout with connection to existing roads, implementation planning
Project duration: January–June 2003
Construction costs: approx. €750,000
Planner: Dersch Ingenieurbüro für Bauwesen Germering
Services: overall planning and construction management of access to commercial park from state road St 2342 with roundabout connection; approx. 500 m access road – including sidewalk and cycle path
Project duration: 2005–today
Construction costs: approx. €100 million
Planner: ILF Beratende Ingenieure ZT GmbH
Services: basic evaluation, preplanning, design planning, planning approval, tender, implementation planning
Project duration: 2006–2007
Construction costs: €1.1 million
Planner: Kirsch – Muchitsch & Partner ZT-GmbH
Services: submission and detailed planning for roundabout construction on B1 at Hörgattern with outside diameter of 50 m – including bicycle underpass
Project duration: 2006–2007
Planner: SBI Verkehr GmbH
Services: access and implementation planning, development plan for Heinenkamp II commercial park in Wolfsburg
Project duration: 2005–2009
Planner: SBI Verkehr GmbH
Services: extension and alteration works on main through-road (district road 34) in Meckelfeld
Project duration: since 2006
Planners: RETTER & Partner ZT Ges.m.b.H., ILF Beratende Ingenieure ZT Gesellschaft mbH
Services: road-related submission project, drainage planning, involvement in the safeguarding of environmental compatibility